Well, since closing on the house in early December we've been very busy with the remodel. Colby and Stella gave the door a new look!
Here are some of the before and after pictures of the changes made.
The Kitchen was in need of a serious makeover and we needed to open up the space. Demo began of removing the kitchen and load bearing wall.
Pic after the LVL beam installed, temporary wall removed and kitchen demo.
Thanks to Jason for his help on all the demo and beam. And thanks to Cameron who helped with flipping the 1/2 bath entry and framing a new entry to the bathroom. And of course a celebratory beer for dropping in the load bearing beam!
Below: floors finished space opened up
Kitchen cabinets delivered.
Here are a few more pics of the progress before move in day. Updated electrical in the kitchen with can lights, relocated outlets, switches on dimmers. Freshly painted.
New cabinets installed.